Master Plan - Existing (0)
Master Plan - Transit Line (1)
Master Plan - Conservation Line (2)
Phasing Concept Plan (4)
| Boundary Phase 1 |
| Development Footprint Limit |
| Mixed Use Development District (MUDD) |
Stormwater Basin (5)
Land Use Controls and Activity and Use Limitations (3)
| SWNAS Perimeter/Areas Investigated And Remediated to the Extent Required By The Navy Under EPA And MASSDEP Supervision |
| Previous Developed Areas |
| Proposed Development Footprint |
| Groundwater Use Controls |
| Land Use Restrictions |
| Area Under Active Remediation By The Navy |
| AUL Area |
|